
Lynde Shores Conservation Area Restoration and Resilience Project
Lynde Shores Conservation Area includes two Provincially Significant Coastal Wetlands. CLOCA collaborated with Canada Water Agency in 2024 to enhance the health and resilience of these crucial ecosystems and has developed a series of restoration projects to mitigate the threats facing the coastal wetlands of Lynde Creek Marsh and Cranberry Marsh. Additional funds were received in 2026 from the Wetland Conservation Partnership Program to expand these projects. Other funding partners include Ducks Unlimited Canada, the Region of Durham, and BGC Engineering.
​
Projects include
​
-
Wetland interspersion restoration of a section of Lynde Creek Marsh
-
Four wetland restorations​
-
Barrier beach restoration for both coastal wetlands
-
Boardwalk feature on the Osprey Wetland
-
Two new lookouts
​

aj groen
Oshawa Second Marsh Restoration and Resilience Project
In 2024, CLOCA received $1.6M from Canada Water Agency to enhance the health and resilience of Oshawa Second Marsh. Two years later, in partnership with the City of Oshawa, an additional $1M was received through the Province of Ontario's Species Conservation Program. This provincial investment will support targeted habitat restoration and enhancement initiatives designed to improve climate resilience and actively support local species at risk, including the Least Bittern (threatened), Blanding’s Turtle (threatened) and American Eel (endangered). Over the next several years, these federal (2024-2028) and provincial (2026-2030) investments will support a comprehensive and integrated restoration approach focused on species at risk and habitat enhancement and will strengthen the long-term climate resilience and ecological integrity of Oshawa Second Marsh.
​
Projects include
​
-
Phragmites management
-
Barrier beach resilience design
-
Hydrology/wetland water level improvements
-
Removal of existing pumping infrastructure
-
Interspersion and bathymetry restoration
-
Dike enhancements for long-term protection

Stream Restoration using PALS and Brush Bundles
Healthy streams have deep pools, fast-moving shallow areas (riffles), and collections of sediment (bars), all of which are naturally created by wood accumulation. Post-assisted log structures (PALS) are nature-based, low-cost, hand-built, restoration structures designed to kick-start the natural processes that create more instream complexity and variability, allowing streams to repair themselves.
​
Similar to PALS, brush bundles are also a process-based restoration technique made by stacking recycled holiday trees beside eroded banks and securing them to the bank with a metal cable in a ‘zipper’ pattern. They reduce erosion by slowing the flow of water and trapping sediment from the stream. They also capture soil that falls from steep slopes, creating stable areas where riparian (stream edge) vegetation can establish, while also providing habitat for fish and aquatic insects.

Westside Creek Wetland Restoration and Resilience Project
Westside Creek Wetland had become severely degraded by invasive species; lacking biodiversity and open water areas. The goal of this project was to restore its function, including acting as a flood prevention buffer, providing ecological benefits for wildlife, improving water quality, and enhancing the broader watershed.
​
Projects include
​
-
Wetland interspersion restoration
-
Phragmites management
-
Upland buckthorn management and native species plantings

